Worked example • illustrative data
Allocate Three Spools Across Five Projects
Scenario
Five separate jobs compete for three compatible PLA blue spools.
Inputs and assumptions
Spools A 400 g, B 300 g, C 200 g. Jobs 1–5 require 250, 200, 180, 150 and 170 g.
Calculation steps
- Reserve Job 1 from A: A has 150 g free.
- Reserve Job 2 from B: B has 100 g free.
- Reserve Job 3 from C: C has 20 g free.
- Reserve Job 4 from A: A has 0 g free.
- Job 5 needs 170 g; B and C offer only 120 g combined.
Result
Total demand is 950 g against 900 g stock: aggregate gap 50 g. For Job 5 as a continuous single-spool print, the best free spool has 100 g, leaving 70 g short.
Limits
The 50 g aggregate gap assumes a practical changeover. Reservations do not deduct physical stock. Cancelling a job releases its commitment without adding grams.
These values are examples, not measurements from a real printing experiment. Recalculate with your own settings using the Multi-Project Filament Planner.